WP1 Specifications

Timeline:

Start M1 – End M9

Work Package leader:

Dr. Thomas Kraft VTT

Objectives:

WP1 creates demonstration concepts, defines use cases at a detailed level, guides technology development and evaluates technology building blocks. The objectives of WP1 are to

  • Define user-use cases and requirements specifications at a detailed level for industrial production in WP5
  • Compare the state-of-the-art building blocks and architectures (defined in WP2 and WP3) and align them with the use cases.
  • Define the key technologies and partner value chains for each concept demonstrator, based on the work of WP 2 to 5.
  • Identify technological synergies between use cases and draw up co-development plans (contribution toWP 4 and 5).
  • Analyse the constraints of the use cases and the technologies chosen: size and power of organic photovoltaics (OPV); size and power of supercapacitors (SC); integration of power management integrated circuits (PMIC); energy requirements for the two targeted demonstration units manufactured in WP5 at TRL7.

Participants:

Deliverables:

This work package will deliver

1 – Product designs
2 – Material designs