WP1 Specifications

Timeline :

Start M1 – End M9

Work package Leader :

Dr. Thomas Kraft VTT

Objectives :

WP1 creates demonstrator concepts, defines user cases to a detailed level, orientates the technology development and benchmarks technological building blocks . The objectives of WP1 are

  • Define application-user cases and requirement specifications to a detailed level for industrial production in WP5
  • Benchmark state-of-the-art building blocks and architectures (defined in WPs 2&3) and align with user cases
  • Define key technologies and partner value chains for each concept demonstrator, inputting to WPs 2 to 5
  • Identify technology element synergies between user cases and make co-development plans (input to WP4 & 5)
  • Analyse user case requirements and chosen technologies: organic photovoltaics (OPV) size and power; supercapacitor (SC) size and power; power management integrated circuit (PMIC) integration; energy requirements for the two demonstrator units targeted manufactured in WP5 at TRL7

Participants :

Deliverables :

This work package will deliver

  • 1 – Product Designs
  • 2 – Material designs